Viaduct over the Tejo River

Cliente

UTE Cãnaveral (COPASA-COPISA)

Ejecución

August 2012 - July 2014

País

Spain

Clasificación

Execution of Bridge Deck with Moving Scaffolding System

Proyecto

Madrid-Extremadura High-Speed Rail (L.A.V.). Section: Cañaveral - Alcántara Reservoir

Descripción

Operation of overhead MSS Type AP-2005.
Access viaducts: 20 spans with a maximum length of 60m.

Aplicación Espontánea

"*" indicates required fields

Max. file size: 2 MB.