Sar Viaduct

Cliente

Atesvi S.L - FERROVIAL AGROMAN

Ejecución

September 2009 - March 2011

País

Spain

Clasificación

Execution of Bridge Deck with Moving Scaffolding System

Proyecto

Atlantic Axis High-Speed Rail (L.A.V.). Section: Rialiño - Padrón

Descripción

Full execution of abutments, footings and piers.
Operation of overhead MSS Type AP-2005.
Length: 2.411m. 46 spans with a maximum length of 55m.

Aplicación Espontánea

"*" indicates required fields

Max. file size: 2 MB.