Changuinola HP Tunnel

Cliente

Consórcio CHC (COBRA - OSSA)

Ejecución

March 2019 - December 2019

País

Panama

Clasificación

Tunnel Internal Facing Execution

Proyecto

Repair of the Changuinola I Hydroelectric Power Plant Tunnel

Descripción

Operation of 2 tunnel formwork equipment.
Execution of internal facing in the mining tunnel.

Aplicación Espontánea

"*" indicates required fields

Max. file size: 2 MB.