Sector 2 Tunnels

Cliente

UTE Sector 2 (DRAGADOS-TECSA-AMENABAR)

Ejecución

March 2020 - December 2023

País

Spain

Clasificación

Tunel Internal Facing Execution

Proyecto

Basque High-Speed Rail (L.A.V.) Vitoria-Bilbao-San Sebastián. Section: Mondragón-Elorrio-Bergara. Sector 2

Descripción

Supply of 4 tunnel formwork equipment.
Execution of internal facing in the mining tunnel.
Execution of galleries, connections, entries and false tunnels.

Aplicación Espontánea

"*" indicates required fields

Max. file size: 2 MB.